Our engineering team conducted a complete review of cargo specifications — weight distribution, dimensional profile, and centre-of-gravity calculations — for the 800-ton module and each supporting oversized package. The technical assessment informed customised lifting plans: optimal sling angles, spreader-beam requirements, pick-point selection, and crane positioning. Risk assessment protocols, weather windows, tidal conditions, and vessel stability factors were integrated into the operational timeline.